Mechanical & Electrical

Electrical and plumbing systems can be easily installed in an ICF built dwelling. 

Wall openings or ducts for service penetrations can be positioned within the formwork prior to concrete pouring. Where services are to penetrate the wall, a duct or sleeve through the Altherm ICF System should be inserted prior to placing the concrete. Electrical cables should be ducted. The cables must be placed in PVC conduit and must be sized to minimise heat buildup with resulting fire risk, in accordance with ETCI (Electro-Technical Council of Ireland) requirements documents I.S. 10101[12] and ET 207[13].



Using the Altherm ICF range of products, many certified housing projects have been successfully delivered for local authorities and housing bodies, including Cluid, Tuatha, Respond, HSE, IRES, and Urbeo. 